The Charter Team worked through harsh winter conditions installing the coir log containment area. In order to properly spread the dredge material within the impoundment area, Charter acquired an airboat with a fan mounted atop the stern that allowed us to navigate the impoundment without disturbing the sediment. A debris box was used to collect organic debris and eliminate voids in fill area. Filled with organic debris like rootballs and vines, Charter outfitted its dredge cutterhead with a protective shield to avoid dredge downtime. The containment area was designed to become an emergent and forested wetland.Ĭharter deployed a small hydraulic dredge navigated on steel wires connected to the shoreline, as well as some associated floating plant. Owner: US Army Corps of Engineer - New England DistrictĬharter was hired to support a dredging operation on Milford Pond in Milford, MA meant to deepen the south end of the pond shallowed by siltation, and dispose of the material in a 34-acre containment area on the northern edge.So, you may have to call several to find out which is best for your situation.Īlso, remember that permits are required for dredging submerged areas pursuant to Parts 301, Inland Lakes and Streams, Part 303, Wetlands Protection, and/or Part 325, Great Lakes Submerged Lands, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended. Some work mainly in small lakes while others perform very large jobs. I am not recommending one over others that are not listed. Here is a list of some of these companies. There are several lake and pond companies that include dredging as part of their services.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |